![]() |
THORBURN
ASSOCIATES
INC. Acoustic and Audiovisual Consultants Audio Video Control Acoustics Design and Engineering |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Project Experience
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Archbishop Mitty High School, San Jose, CA |
|
|
The Steinberg Group |
Measurement of noise from the football field/track area and recommendations to mitigate the transfer of that noise to the adjacent residential areas. |
Monte Vista High School, Danville, CA |
|
|
Monte Vista Band Boosters |
Acoustical finish recommendations to lower the decibel and reverberation level in the band's rehearsal room. |
O'Gorman High School, Sioux Falls, SD |
|
|
The Winkels Group, Inc. |
Chose acoustical finishes and gave HVAC recommendations for a new chapel area. Two classrooms of this high school were demolished to provide room for the worship area. |
Davis High School, Davis, CA |
|
|
The Steinberg Group |
Provided acoustical details for a new 33,000 square foot library/classroom building with a convex curved ceiling. The 2-story building has an 18,000 square foot library for 2500 students, 10 classrooms, textbook storage, and processing areas. |
Windsor Middle School, Windsor, CA |
|
|
Quattrocchi Architecture |
Acoustical recommendations for room finishes, ceiling constructions, and mechanical noise control for a new middle school. The school includes four clusters of classrooms, a cafeteria/multi-purpose facility with a stage, a library/media center, administration space, and a gymnasium with locker rooms. |
Newman - Crows Landing Middle School, Newman, CA |
|
|
The Steinberg Group |
Provided acoustical design guidelines for new middle school which holds 850 students. School buildings include a music/performing arts room, cafeteria, science lab, administration building, and numerous classrooms. |
Saint Paul's Episcopal School, Oakland, CA |
|
|
Tanner Leddy Maytum Stacey |
Reviewed construction documents and made acoustical recommendations for an addition to the school which contains a gymnasium and a building with 12 classrooms. Also provided an acoustical design for the music room. |
Saint Mary's Catholic Center, San Francisco, CA |
|
|
Gordon H. Chong & Partners Herman Stoller Coliver |
Provided input for acoustical design of interior spaces, sound isolation requirements, and mechanical noise an vibration control methods. Additionally designed the audiovisual system for this facility, which contains a chapel, gymnasium, school, 17 floors of housing, and a parking garage. |
New Orchard Elementary School, San Jose, CA |
|
|
The Steinberg Group |
Room acoustics, sound isolation, and mechanical noise and vibration control services were provided for this 850-student school. Area included classrooms, the library, a technical center, a multi-purpose room, and conference rooms. |
Peninsula School, Menlo Park, CA |
|
|
Jacobson Silverstein Winslow Architects |
Recommendation of wall finishes to improve the acoustics of a school's indoor play area. |
New Traditions Elementary School, San Francisco, CA |
|
|
Levy Design Partners |
Design of a sound system for the school cafeteria which also serves as the auditorium. Additional services included recommending specific acoustical wall finishes and lighting controls for the auditorium/cafeteria. |
Fremont School, Fremont, CA |
|
|
ATI Engineering |
Calculated amount of noise caused chiller and determined the impact on nearby classrooms. |
Diablo Hills Country School, San Ramon, CA |
|
|
David Bengtson |
Review of construction plans for a 90-student, 4,600 square foot pre-school to verify noise reduction specifications. |
McAuliffe Elementary School, Saratoga, CA |
|
|
The Steinberg Group |
Selection of acoustical wall finishes and recommendation of HVAC noise control in the classroom and library for this new school. |
PAST PROJECTS |
|
De Vargus School, Cupertino, CA |
|
|
The Steinberg Group |
Sound isolation recommendations for partitions between service yard, shipping/receiving area, and nearby offices. |
Stevens Creek/Eisenhower/De Vargus/Regnart/Garden Gate Guided Learning Centers, Cupertino, CA |
|
|
Cupertino School District |
The Cupertino School District wanted to develop a series of classrooms where students can receive specialized instruction in math, science, and computer technology. The Guided Learning Centers contain one large multi-purpose stage/auditorium/community meeting room surrounded by math and science classrooms. The design challenge was to provide a space that would allow the multi-purpose room to function at the same time as the classrooms. The associated classrooms had glass window/walls looking into the auditorium. The acoustical room finishes for the domed ceiling were of particular concern to minimize the focusing of the active noise in the facility. The audio system design required that the system be easy to operate, rugged, and student proof. |
Alameda High School, Alameda, CA |
|
|
Historic Alameda Foundation |
Recommendations for the acoustical design during the renovation of the auditorium. |
Past projects are personal experience of TA principals.